Skip to main content
Version: 24.3

Portfolio Item Cycle Time Dashboard Panel

The Analytics Portfolio Item Cycle Time dashboard panel allows you to visualize the amount of time portfolio items spend in a range of status values by Total Estimate.

Where to Find This Panel

This panel is available on any of the following Analytics dashboards:

  • Portfolio > Dashboard
  • Portfolio > Executive Dashboard
  • Program > Product Owner Dashboard
  • Team > Team Dashboard
  • Team > Quality Dashboard
  • Team > ScrumMaster Dashboard

If the panel is not visible, you can add it following the instructions in Adding a Panel to a Dashboard.

Measures

This panel is a scatter plot indicating how long tracked portfolio items (those visible on the Portfolio Item grid) spent in a configurable cycle (range of status values). Results are grouped based on Total Estimate for the Portfolio Items considered.

For each Total Estimate grouping, there are three data points:

  • The average time it took portfolio items to flow through the cycle (indicated with a dot).
  • The maximum time it took portfolio items to flow through the cycle (indicated with a triangle).
  • The minimum time it took portfolio items to flow through the cycle (indicated with a square).

Panel Parameters

To configure the panel, click on the gear icon Analytics Gear Icon at the top-right corner and click Edit.

  • The parameters for this panel are the same for all dashboard where the panel is located.
    • Cycle Start
    • Cycle End
    • State
    • Include Items After

The following table describes each panel parameter.

ParameterDescriptionDefault
Cycle StartThe Portfolio Item Status Value that indicates the beginning of the cycleYou must select this value
Cycle EndThe Portfolio Item Status Value that indicates the end of the cycle.You must select this value
StateWhich Portfolio Item States to consider:
All. Consider All Portfolio Items regardless of State
Open. Only consider Portfolio Items that are currently visible on the board
Closed. Only consider Portfolio Items that are no longer visible on the board
All
Include Items AfterDo not include items that entered the cycle before this dateThe current date last year.  This means you are only considering items that flowed through the cycle in the last year.