Tracking Progress in the Backlog Grid
This article explains how to track progress in the Backlog Grid.
Overview
The Detail Tracking page shows all the open work in a sprint or iteration and can be used to view or update time and status. It is divided into two sections: Sprint or Iteration Summary and Backlog grid. The bottom of the page displays the Backlog grid. Here, you can enter Effort Hrs. (if tracked) and update the remaining To Do Hrs. estimate for each item that has changed.
Detail Estimates are also set for each task and, optionally, tests during sprint planning. These Detail Estimates are generally left as is once sprint planning is complete.
Tracking can also be done on each team member's My Home page. The My Home page provides a filtered view for each team member. As such, it is often preferred when individuals are doing their own entry.
Accessing the Backlog Item Grid
To access the Backlog Grid on the Detail Tracking page, go to the main menu and click Team > Detail Tracking.
Things You Can Do
- Update Status Values
- Update a task, test, backlog item, or defect
- Close stories and defects
- View and Modify Blocked Items
- View Item History
Checking the Include Closed Items checkbox in the filter will display tasks with zero remaining To Do values.